We started 2017 with the continuation of work in the “Black Box” theater.  The new floor and handicap ramp installed in 2016 received a floor finish and railings.  The walls and ceiling in the “black box” that sustained damage from demolition have been patched or repaired to maintain the fire rating (Jim’s Drywall Service) and…

Read More